by admin02/04/2026 Pre-Commissioning Site Readiness 1. Application Scenario Project Name No. of Battery Cabinet Primary Application Scenario -- Select an option -- Grid-tied Grid-tied EV Charging On&Off-Grid Site uses higher-level EMS for dispatch commands 2. Project Scope & Topologies Electrical topology diagram provided Network topology diagram provided 3. Installation Status Combiner cabinets installed and wired (if needed) AC cables are wired and connected to each battery according to User Manual Safe power-on conditions met for immediate commissioning Ethernet cables are wired and connected to each battery correctly (if needed) Communication Wiring Status -- Select wiring type -- 4G Cellular Wireless (Wi-Fi) Ethernet Cable 4. Network Status Internet has connected Network switch has equipped for multi-unit connection (if needed) Permission granted for cloud monitoring platform connection Submit Readiness Report